BidRiseBidRise.ai(801) 319-7775Call
BidRisePlumbing price book

Flat rate pricing

Build a plumbing price book that holds up

A plumbing price book is the list of what you charge for the work you do, set before you’re standing in front of a customer. It’s the difference between a price and a guess, and it’s the one piece of paperwork that pays you back every single job.
Download on the App StoreGet it on Google Play
Told Plumbing company logo

“This app pays for itself.” JP, Told Plumbing

Why shops price from a book

Pricing in your head is fine until the day you’re tired, the customer is friendly, and the job is bigger than it looked. Then you give a number you regret for the next six hours. A book means the price was decided in your office, by you, when nobody was standing there waiting.

It also means every tech quotes the same job the same way. Two trucks giving two prices for a water heater swap is the fastest way to lose a customer who talks to their neighbor.

What belongs in a flat rate price

Four things, and most underpriced books are missing the same two.

  • Material at your cost, plus markup. Not list, not what you paid two years ago. What it costs you this month.
  • The labor the job really takes. Drive time, setup, pulling the old unit, cleanup, and the conversation at the door. Not just the wrench time.
  • Overhead. The truck, the insurance, the phone that answers, the software, the person doing the books. Divide the yearly number by your billable hours and carry it on every hour you sell.
  • Profit. Separate from your own wage. If the only profit in the business is your paycheck, you own a job, not a shop.

The two that go missing are overhead and profit, which is exactly why a shop can be busy all year and finish it with nothing in the account.

Start with the jobs you actually run

Pull your last fifty invoices and sort them by what the work was. Most residential service shops will find a short list doing most of the revenue: water heater replacement, drain cable, toilet rebuild or replace, faucet replacement, hose bib, shutoff valves, a disposal, pressure regulator. Price those properly first. Everything else can wait.

Keeping it from going stale

This is where most price books fail. Copper moves. Water heaters move. The book does not, because updating it’s nobody’s job on a Tuesday.

Two habits fix it:

  • Put a date on it. If you can’t remember the last time you touched it, it is out of date.
  • Catch corrections as they happen. When a tech has to change a price in the field, that’s the book telling you it’s wrong. Write it down the day it happens, not at the end of the quarter when nobody remembers.

BidRise does the second one for you. When you correct a price on an estimate, it offers to save the new number back to your price book, and it tells you when you’ve corrected the same item more than once.

Flat rate versus time and materials

Flat rate isn’t about charging more. It’s about the customer knowing the number before work starts, and you carrying the risk on how long it takes. That trade is good for you on work you’ve done a hundred times and bad on work nobody can scope from the doorway.

There’s a longer piece on this in flat rate vs time and materials, including where each one bleeds money.

Loading your book into BidRise

Three ways in: type it, upload a spreadsheet, or photograph the printed sheet you already carry and let the app read it. Set your material markup and your sales tax rate once, and every estimate after that comes out priced the way you decided. Then the app does the arithmetic so nobody is adding up a column on the tailgate.

If you want a paper starting point instead, the plumbing estimate template is free and lays out the same line structure.

Questions contractors ask

How many items should a plumbing price book have?

Start with the twenty or thirty jobs you actually run. Most residential service shops get the large majority of their revenue from a short list. A book with four hundred entries that nobody maintains is worse than a short one that’s right.

What goes into a flat rate price?

Material at your cost plus your markup, the labor hours the job really takes including setup and cleanup, your overhead per hour, and your profit. The common mistake is pricing the hours you’re turning a wrench and not the hours the job occupies.

How often should I update it?

Whenever your supplier cost moves enough to matter, and at minimum once a quarter. A price book that’s a year old is quietly selling last year’s copper at last year’s price.

Flat rate or time and materials?

Flat rate gives the customer a number before you start and protects you when a job goes long. Time and materials can be fairer on unknowns like a slab leak. Plenty of shops use flat rate for known work and time and materials for diagnostics.

Can I load my existing price book into BidRise?

Yes. You can type it in, upload a spreadsheet, or take a photo of a printed price sheet and let the app read it. You check it before it saves.

Keep reading

Good better best pricingGive the customer three choices instead of one yes-or-no question.The plumbing estimating appBuild the estimate on your phone, standing in the customer’s house.Plumbing estimate templateFree printable estimate form you can fill in by hand.

What you’d be using

Talk through the job. Drive away with it signed.

  • Say what you’re doing. It writes the line items.
  • Prices come off your own book, not a guess.
  • They sign on their phone before you’ve packed up.
Try it free for 30 daysNo card. Your real jobs.
The BidRise bid list, showing approved, sent and draft bids with their totals
BidRiseBidRise.ai
What’s BidRise?GuidesTermsPrivacy